Aug 17, 2001

Aug 17, 2001

Another view of the trench with the gray plastic conduit in place. There is a 3 foot deep hole under the wheelbarrow (placed on top as a safety precaution) which will soon hold a 10 foot high galvanized pole to hold the satellite dishes.

BuiltWithNOF